I’m installing oak and maple strip flooring and thresholds. Need to taper some of these boards to keep floor running true. Can anyone suggest best way to do this? I’ve seen some cheap taper jigs advertised but am skeptical.
Discussion Forum
Get It All!
UNLIMITED Membership is like taking a master class in woodworking for less than $10 a month.
Start Your Free TrialCategories
Discussion Forum
Digital Plans Library
Member exclusive! – Plans for everyone – from beginners to experts – right at your fingertips.
Highlights
-
Shape Your Skills
when you sign up for our emails
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply. -
Shop Talk Live Podcast
-
Our favorite articles and videos
-
E-Learning Courses from Fine Woodworking
-
-
Replies
If you can mark the line you need to follow, a hand plane makes it pretty easy. You would be done by the time you set up the jig unless you need to remove a lot of material..
some of the thresholds require 1/4 in or better stock removal. Also dealing with some out of parallel walls. What are your feelings about electric planers?
If there will be a shoe moulding over the outside edge it really doesn't matter how you do it.
"I cut this piece four times and it's still too short."
Hi 67,
I am a contractor that has laid more floor than I care to admit to. I think that you are on the right track with the plane. Near walls, if there is trim, we just get the flooring under the trim and that's it., Otherwise, we use power planes for the bulk of our work, but to really tweak something, a hand-plane is the choice to finish with. One note about flooring, if there is a wee bit of play, say 1/64 or under in spots, that is fine. The floor will move with time, in particular the oak. You don't want the flooring to touch the walls, give it a 1/4" or more to move.
Good Luck!
John
This forum post is now archived. Commenting has been disabled